Install
Recommended post spacing should match your selected rail lengths.
Mark the full run and confirm post spacing against your chosen rail length.
Set posts to the correct in-ground depth and allow concrete to cure.
Fit rails into position across the 2 or 3 rail configuration.
Fasten and secure all connection points along the run.
Confirm the line is straight and level, and complete a final check.

Maintenance
Rapid Rail fencing requires minimal maintenance. Periodic washing is recommended in coastal or industrial environments to keep the finish looking its best.
Notes for Installers
Installers should confirm all site conditions prior to installation. Engineering requirements may vary depending on site and wind zone.
Documents

Specifications, applications and installation overview (PDF).